20th January, Strahan- West Coast Wilderness Railway APT Railway

Map on the station at Strahan.

Carriage that we were riding in.

Huon Pine growing on the station platform along the line.

Helen enjoying the ride, we were in the carriage behind the engine.

King River gorge.

Dubbil Barril station the point on the line when the engines are changed to include the APT central drive gear.
On the station at Dubbil Barril after having lunch and a walk around.
One of the many bridges with the central drive for the train to climb the steep grade.

One of the many stations on the way to Queenstown.

Another view of the river coming out if Queenstown.

Outside Queenstown station.

A dedication telling the story of mining in the Queenstown area. Waiting for the bus to take us back to Strahan.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.