Cressbrook Dam spillway access road 04092010
Had to go out and do an inspection so thought I would take the cruiser for a run.
The access road is cut into the hill on the other side of the spillway , the concrete walls are 10 metres high and the water level 2o metres below spillway level
driving out
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.